by Software Toolbox
EPBD Hub

Directive (EU) 2024/1275, explained for owners.

The recast Energy Performance of Buildings Directive entered into force on 28 May 2024. It obliges every member state to drive its building stock to zero emissions by 2050, with hard intermediate deadlines: minimum energy performance standards from 2030, zero-emission new builds from 2028 for public buildings and 2030 for all, mandatory building automation, solar obligations, renovation passports and rescaled energy performance certificates.

Member states had to transpose it by 29 May 2026. On 15 July 2026 the Commission opened infringement procedures against all 27. National frameworks are landing late and unevenly, which increases buyer urgency: the EU-level deadlines are fixed, and multi-year renovation and instrumentation programmes cannot wait for national clarity.

EPCs, rescaled A to GRenovation passportsDigital building logbooksSmart Readiness IndicatorArt. 23 inspectionsBuilding Stock Observatory reporting

The compliance timeline, 2024 to 2050

TODAY:

Exact thresholds and carve-outs vary with national transposition. chatEPBD treats country rules as configurable rule packs, never hard-coded EU text.

31 Dec 2024
Building automation and control systems mandatory in non-residential buildings with HVAC effective rated output above 290 kW.
Art. 13
1 Jan 2025
No financial incentives for stand-alone fossil fuel boilers.
Art. 17
29 May 2026
Transposition deadline. Harmonised EPC template; national renovation passport schemes.
Art. 35, 19, 12
30 Jun 2026
Commission report on Smart Readiness Indicator test phases.
Art. 15
15 Jul 2026
The Commission opens infringement procedures against all 27 member states for incomplete transposition. The deadlines did not move.
Infringement
31 Dec 2026
New public and non-residential buildings above 250 m2 solar-ready or fitted. Final National Building Renovation Plans due.
Art. 10, 3
30 Jun 2027
Commission act detailing SRI application to non-residential buildings above 290 kW.
Art. 15
31 Dec 2027
Solar on existing public buildings, phased by size, largest first; and on non-residential buildings above 500 m2 undergoing major renovation.
Art. 10
1 Jan 2028
All new public buildings zero-emission. Life-cycle GWP disclosure for new buildings above 1,000 m2.
Art. 7, 11
31 Dec 2029
New residential buildings solar-ready. BACS threshold drops to 70 kW. E-mobility pre-cabling regime fully phased.
Art. 10, 13, 14
1 Jan 2030
All new buildings zero-emission. Non-residential stock must sit above the worst-performing 16% threshold, measured against the national stock on 1 January 2020. Residential average primary energy use down at least 16% versus 2020.
Art. 7, 9
2033
Non-residential threshold tightens to 26%.
Art. 9
2035
Residential average primary energy use down 20 to 22% versus 2020.
Art. 9
2040
National trajectories target full fossil fuel boiler phase-out.
Art. 17, 3
2050
Fully decarbonised, zero-emission building stock.
Art. 1

Article by article, mapped to the platform

Every obligation in plain English, with the module and agents that answer it.

Art. 9 · MEPS2030 / 2033 / 2035

Non-residential buildings must clear the worst-16% then worst-26% thresholds; residential stock must cut average primary energy 16%, then 20 to 22%.

M3 Compliance Cockpit · MEPS Sentinel, Scenario Modeller
Art. 7, 11 · ZEB and GWP2028 / 2030

New builds zero-emission; IAQ devices in ZEBs; life-cycle carbon disclosure on new buildings above 1,000 m2, then all.

M5 ZEB and carbon, M9 IEQ · GWP Reporter, IEQ Guardian
Art. 12 · Renovation passportsfrom May 2026

Staged, building-specific roadmaps to zero-emission by 2050, content per Annex VIII, feeding national schemes and the logbook.

M4 Passport Studio · Passport Drafter, Subsidy Scout
Art. 13 · BACSnow / end 2029

Building automation with monitoring, benchmarking, fault detection and interoperability above 290 kW now, 70 kW by end 2029; room-level self-regulation.

M6 BACS and optimisation · BACS Auditor, FDD Engineer
Art. 10 · Solar2026 to 2030

Solar-ready and solar-fitted obligations phased by building type and size, starting with new public and non-residential above 250 m2.

Art. 14 · E-mobilityphased, incl. 2027

Pre-cabling and charge-point minimums for new, renovated and existing car parks.

M8 Solar, heat, e-mobility · Tariff and Flex Agent
Art. 15 · SRI2026 / 2027

A common EU scheme rating how well a building senses, responds and interacts with occupants and the grid; expected mandatory for large non-residential buildings after the June 2027 act.

M7 SRI studio · SRI Assessor
Art. 17 · Fossil boilers2025 / 2040

Incentive ban on stand-alone fossil fuel boilers since January 2025; national trajectories target full phase-out by 2040.

M8 Solar, heat, e-mobility · Boiler Phase-out Planner
Art. 19 · EPCs and databasesfrom May 2026

Harmonised A to G certificates with class A reserved for zero-emission buildings; national databases and Building Stock Observatory reporting.

M3 Cockpit, M10 Reporting hub · EPC Ledger, Report Runner
Art. 23 · Inspectionsongoing

Regular physical inspections of heating and air-conditioning above 70 kW, with exemptions for buildings covered by compliant BACS or energy performance contracting. A direct, monetisable hook.

M6 BACS and optimisation · Inspection Exemption Agent

Country guides

Initial beachheads, chosen for transposition maturity, BMS penetration and channel presence. Every member state received a letter of formal notice in July 2026; national rules land late and unevenly, so each guide pairs transposition status with rule-pack availability.

GermanyRule pack: Phase 1

Transposition incomplete; infringement notice July 2026. DE rule pack ships with MVP GA (Q1 2027).

NetherlandsRule pack: Phase 1

Transposition incomplete; infringement notice July 2026. NL rule pack ships with MVP GA (Q1 2027).

FranceRule pack: Phase 2

Transposition incomplete; infringement notice July 2026. FR rule pack in Phase 2 (2027). Locally the directive is often called PEB or DPEB; the guide carries both terms.

IrelandRule pack: Phase 2

Transposition incomplete; infringement notice July 2026. IE rule pack in Phase 2 (2027).

SpainRule pack: Phase 2

Transposition incomplete; infringement notice July 2026. ES rule pack in Phase 2 (2027).

NordicsRule pack: Phase 2

Transposition incomplete across the region; infringement notices July 2026. Nordic rule packs in Phase 2 (2027).

chatEPBD informs; national law governs. Rule packs are versioned content, updated as transpositions land.

Where does your portfolio stand today?

The readiness check maps one building against every dated duty above. Fixed fee, two weeks, credited against year one.

Run a free EPBD readiness check